Hello all,
We have been asked to run a gas pipe from a gas meter room(skid) down to EC supplying three boilers and CHP.
The problem is that the gas pipe (125 mm) needs to run through LV electrical room(unventilated) so the question is:
Is this allowed to run gas pipe through electrical room?
If yes or not, is it possible somebody to quote a standard that I could check in.
Many thanks.
We have been asked to run a gas pipe from a gas meter room(skid) down to EC supplying three boilers and CHP.
The problem is that the gas pipe (125 mm) needs to run through LV electrical room(unventilated) so the question is:
Is this allowed to run gas pipe through electrical room?
If yes or not, is it possible somebody to quote a standard that I could check in.
Many thanks.