Dave the rave
Junior Member
- Joined
- Nov 20, 2011
- Messages
- 11
- Reaction score
- 0
If a gas bond has been missed in 4 separate flats, is in possible to bond from one flat ccu where the MET is and then link between four gas meters? Obviously without cutting the bond and keeping it continuous threw out. Is it possible to to put an earth stake at the meter and bond via that???? Help would be appreciate ,,