Watching the news this morning the LFB need to make £11m in cuts. perhaps this is part of reducing the overall cost of firefighting in London
The LFB were simply in control of the statistics and demanded a solution the technicalities of the solution fell at the feet of the Jpel64, IET, ESF and the manufacturers who are all in it up to their necks.
This is a crap decision and we all know it.
How about VDE enclosures?
The LFB were simply in control of the statistics and demanded a solution the technicalities of the solution fell at the feet of the Jpel64, IET, ESF and the manufacturers who are all in it up to their necks.
This is a crap decision and we all know it.
How about VDE enclosures?