green-hornet
Distinguished Member
- Joined
- Feb 25, 2009
- Messages
- 3,741
- Reaction score
- 0
I think I have found the ultimate job from hell.
I was called in to do the first fix for a job, I bashed hell out of the ceilings and lay cables for all the lighting I even cut out clear runs for pull through cables and the like. Anyway first fix done, new ceilings and plastering done and guess what? everything was wired and first fixed for florecents and they changed their minds and wanted downlights.
Best part is I had to work alongside the decorator, the floorer and the cabinet installers all at the same time, I think there is now about 17 coats of paint on each wall.
Fellow forum member Lee came over and gave me a hand, I thought at one point he may hit some one, drilling holes in plasterboard will cause dust!
Its one of those jobs where you really want to walk away from but I have invested too much money in the job. I installed dado trunking to the decontamination room and then found out that they are going to install a sink on the wall so I had to cut out the trunking and now have to rewire a socket from another location.
The list of cock ups is endless and this is one job from hell that I would really like to be behind me.
Anyway thanks Lee for your help mate.
I was called in to do the first fix for a job, I bashed hell out of the ceilings and lay cables for all the lighting I even cut out clear runs for pull through cables and the like. Anyway first fix done, new ceilings and plastering done and guess what? everything was wired and first fixed for florecents and they changed their minds and wanted downlights.
Best part is I had to work alongside the decorator, the floorer and the cabinet installers all at the same time, I think there is now about 17 coats of paint on each wall.
Fellow forum member Lee came over and gave me a hand, I thought at one point he may hit some one, drilling holes in plasterboard will cause dust!
Its one of those jobs where you really want to walk away from but I have invested too much money in the job. I installed dado trunking to the decontamination room and then found out that they are going to install a sink on the wall so I had to cut out the trunking and now have to rewire a socket from another location.
The list of cock ups is endless and this is one job from hell that I would really like to be behind me.
Anyway thanks Lee for your help mate.