Theauldhoose
New member
Hi all,
Looking for some advice please, based in central Scotland, have an old house circa 1908, has an overhead line supply, which is then connected into a single concentric core SWA, looks to be circa 25+mm2 live core, with the armored surround acting as a neutral and then joined to the earth lines where it exits the isolator fuse.
I’ve just built a large garage workshop, will be using mostly 13a kit, but have welder / car ramp / compressor / 6 strip lights (not all at the same time) but expecting to average circa 8-20a peak draw, looking to use 10mm2 cable, but how many cores?
Do I go 2 core and fit a earth rod near the garage (steel frame)?
Or do I fit 3 core and run the combined earth / neutral from the house to the garage?
Finally whilst the garage is only 12m from the house, the swa run will be 35m end to end, any issues expected?
Any advice greatly appreciated?
Cheers
Looking for some advice please, based in central Scotland, have an old house circa 1908, has an overhead line supply, which is then connected into a single concentric core SWA, looks to be circa 25+mm2 live core, with the armored surround acting as a neutral and then joined to the earth lines where it exits the isolator fuse.
I’ve just built a large garage workshop, will be using mostly 13a kit, but have welder / car ramp / compressor / 6 strip lights (not all at the same time) but expecting to average circa 8-20a peak draw, looking to use 10mm2 cable, but how many cores?
Do I go 2 core and fit a earth rod near the garage (steel frame)?
Or do I fit 3 core and run the combined earth / neutral from the house to the garage?
Finally whilst the garage is only 12m from the house, the swa run will be 35m end to end, any issues expected?
Any advice greatly appreciated?
Cheers