Outside lights, controlled via PIR with override switch & timer?

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
The OP states there are 2 x 3 core going to the location which should do it.


I know that
You know that
We know that
Not sure why you put "Could it be that this "electrician" hasn't put enough wires in? Just a thought"

However I feel the 'electrician', may be a 2.5 ring/1.5 lights kinda guy
You think he could work out how to wire a 2.5 mm2 ring? :):):)
 
I've only just read all this, need a lie down now.
Do the cables from the PIR, timer, lights and switch all meet in a common space.
 
Yes, sorry to hear that, but they are looking after you.
Long story short
Bladder Cancer 11 years ago ( next week)
Found lump
Hospital all day
Scans etc
Now on weapons grade painkillers and antibiotics for 2 weeks, then another scan to rule out / confirm infection so the wait begins
Hey ho
 
Hi
After reading all the posts ,i cant help thinking the builder or Andrew is trying to do the install themselves . For two so called electricians not being able to figure the wiring Johnb2713 has drawn is worrying ,also not being able to fathom it out .
Andrew is wanting to dot the i's and cross the T's ,smacks of a non electrician trying to do the work on the cheap ,sorry !!

 
Top