As promised; here are a few of the photos from a hotel "up north".....
Main incomer:
MET (note the quality of labelling):
Unusual way of terminating a SWA:
11KV transformer adjacent to incomer panel:
"Ottermill" TPN DB (I haven`t removed any covers, just opened the doors):
MCCB board with cable size issues:
So.....why is there a problem????
KME
Main incomer:
MET (note the quality of labelling):
Unusual way of terminating a SWA:
11KV transformer adjacent to incomer panel:
"Ottermill" TPN DB (I haven`t removed any covers, just opened the doors):
MCCB board with cable size issues:
So.....why is there a problem????
KME