Started this Thursday stripout and rewire,
Got to remove all the old switchgear and refit new gear,Started removing switches on walls and all sockets and 3PH sockets on walls and 110v sockets all wired in PVC conduit.
The person who put the cladding on the outside was a lucky chappie that day because quite a few of the fixing pins went straight through the conduit and heres me thinking this stuffs been fitted bloody well as it was a B*****d to get out.
Got to remove all the old switchgear and refit new gear,Started removing switches on walls and all sockets and 3PH sockets on walls and 110v sockets all wired in PVC conduit.
The person who put the cladding on the outside was a lucky chappie that day because quite a few of the fixing pins went straight through the conduit and heres me thinking this stuffs been fitted bloody well as it was a B*****d to get out.
Last edited by a moderator: