ah right, i've been asked to go into some industrial units soon to disconnect this 'Trend' system and restore the units back to individual controlling. They want to use 'powrtrol' controllers and connect to existing gas blower heaters in place of the 'Trend' wiring. Do you know what additional wiring/equipment would be needed?? I know its a bit vague at the moment, don't know too much about it