1 If it is necessary to carry outlive testing on an electrical system
a) describe how the working area can be made safer (2 marks)
Use barriers and tapes to cordon off the area.
Place warning signs in appropriate positions.
B) List two further precautions that should be take (2 marks)
c) Describe the permit to work procedure (2 marks)
the permit to work is a formal procedure in the form of written authorization
Used to control work in potentially hazardous areas.
And sigend by an designated competent person
2 When designing and building a new hotel complex
a) draw a block diagram showing relationships and lines of (4 marks)
communication
B) List two sets of regulation governing the construction of (2 marks)
electrical systems
a) describe how the working area can be made safer (2 marks)
Use barriers and tapes to cordon off the area.
Place warning signs in appropriate positions.
B) List two further precautions that should be take (2 marks)
c) Describe the permit to work procedure (2 marks)
the permit to work is a formal procedure in the form of written authorization
Used to control work in potentially hazardous areas.
And sigend by an designated competent person
2 When designing and building a new hotel complex
a) draw a block diagram showing relationships and lines of (4 marks)
communication
B) List two sets of regulation governing the construction of (2 marks)
electrical systems