Can someone explain to me when supplementary bonding is required in wet rooms and what type of asseccories need this cross bonding.
I find this confusing in the 17th edition
For example
LV vent fan
Shower pull cord switch
Shower unit
Normal light
Pull cord light switch
Main bonding (10mm) to services are fitted and all circuits are RCD protected.
Thanks Rob
I find this confusing in the 17th edition
For example
LV vent fan
Shower pull cord switch
Shower unit
Normal light
Pull cord light switch
Main bonding (10mm) to services are fitted and all circuits are RCD protected.
Thanks Rob