Mr S Parks
Member
Morning all.
Doing a job just now which will involve terminating swa in the mains(8 properties)
It's 25mm 3 core swa and domestic mains.
It would be nice if it could be hidden in the partician instead of surface mounting and entering via the incomer knockout.
All I can think of is making the end of and using a earth clamp(as used for earth bonding) for the wire armour, connecting an earth to the clamp and bringing all cables in via rear cable entry on the mains![Unamused face :unamused: 😒](https://cdn.jsdelivr.net/joypixels/assets/8.0/png/unicode/64/1f612.png)
.
Does anyone have a better way or experience terminating something similar?
Thanks
Doing a job just now which will involve terminating swa in the mains(8 properties)
It's 25mm 3 core swa and domestic mains.
It would be nice if it could be hidden in the partician instead of surface mounting and entering via the incomer knockout.
All I can think of is making the end of and using a earth clamp(as used for earth bonding) for the wire armour, connecting an earth to the clamp and bringing all cables in via rear cable entry on the mains
![Unamused face :unamused: 😒](https://cdn.jsdelivr.net/joypixels/assets/8.0/png/unicode/64/1f612.png)
![Frowning face :frowning2: ☹️](https://cdn.jsdelivr.net/joypixels/assets/8.0/png/unicode/64/2639.png)
Does anyone have a better way or experience terminating something similar?
Thanks