I have to quote for a job where the customer wants to move a radiator two metres along a wall. In the new position the radiator will cover an existing double socket. The job is to move the double socket two metres back along the wall to where the radiator was initially.
I was thinking of removing the socket face and extending the ring using a connector strip in the original socket back box and covering it with a blanking plate and chasing the wall to the new location and then sinking in the new box. By leaving the original box I aim to maintain the horizontal safe zone,
I am not sure if this arrangement will leave the connector strip
I was thinking of removing the socket face and extending the ring using a connector strip in the original socket back box and covering it with a blanking plate and chasing the wall to the new location and then sinking in the new box. By leaving the original box I aim to maintain the horizontal safe zone,
I am not sure if this arrangement will leave the connector strip