Hi
I have a CU to upgrade, its a large Wylex metal clad, loads of room and slack on cabling and dinrail mounted mcbs.Main switch is a 100ma 80A. I was thinking of leaving all as is and replacing the MCB's with RCBO's. Any reason I can't leave the 100ma in place?!
Ta
Dunx
I have a CU to upgrade, its a large Wylex metal clad, loads of room and slack on cabling and dinrail mounted mcbs.Main switch is a 100ma 80A. I was thinking of leaving all as is and replacing the MCB's with RCBO's. Any reason I can't leave the 100ma in place?!
Ta
Dunx