Just done my first job for a kitchen/bathroom company
8 downlighters fire rated(4 in each room) no access from above (flat roof) and ceiling not coming down
remove and make safe 4 sockets and an extractor fan.
gas/water bonding 20m worth
upgrade main earth 2.5mm--16mm:O
testing
they have already priced in for 8 downlighters but not the bonding (they didnt know what that was: O)
Due to all the messing about measuring and missing the joists,,running the cable etc i have priced it at
8 downlighters fire rated(4 in each room) no access from above (flat roof) and ceiling not coming down
remove and make safe 4 sockets and an extractor fan.
gas/water bonding 20m worth
upgrade main earth 2.5mm--16mm:O
testing
they have already priced in for 8 downlighters but not the bonding (they didnt know what that was: O)
Due to all the messing about measuring and missing the joists,,running the cable etc i have priced it at