OK.
Part "m"
Section "o"
0.2
And section "8"
reachable.
The first point suggest that alterations of the building ARE included (wasn`t sure myself, until I went looking)
However, part 8 appears to have no reference to switchgear or protective equipment.
Would an MCB / RCBo be called a "switch"?
Not by me, it wouldn`t!!!!!
Part "m"
Section "o"
0.2
Under regulation 4(2), where any
building is extended, or undergoes a
material alteration, the building work
must be carried out so that after it has
been completed the building complies
with the applicable requirements of
Schedule 1, or, where it did not fully
comply with any applicable
requirement, it is no more
unsatisfactory than before.building is extended, or undergoes a
material alteration, the building work
must be carried out so that after it has
been completed the building complies
with the applicable requirements of
Schedule 1, or, where it did not fully
comply with any applicable
requirement, it is no more
And section "8"
8.2 Switches and socket outlets for
lighting and other equipment should be
located so that they are easily
lighting and other equipment should be
located so that they are easily
reachable.
The first point suggest that alterations of the building ARE included (wasn`t sure myself, until I went looking)
However, part 8 appears to have no reference to switchgear or protective equipment.
Would an MCB / RCBo be called a "switch"?
Not by me, it wouldn`t!!!!!